Categories

Polls

How often do you bike to work/school?

View Results

Loading ... Loading ...

Cycling Master Plan Public Presentation - April 19th, 2010

There will be a public review period for Volume 1 – Cycling Master Plan and a Public Information Session (including presentation) on Monday, April 19, 2010 @ 7-9 p.m. at Noel Ryan Auditorium, Central Library, 301 Burnhamthorpe Road West (map).

The presentation begins at 7:30 p.m. Click here for POSTER.

The agenda for the evening [...]

Unoffical Results of Cycling Survey

The City of Mississauga with iTrans conducted a survey from January until September 2008 to obtain opinions about cycling in Mississauga. Preliminary results of the survey have been released,

[...]

The Transportation Food Chain

Some cyclists tend to complain to no end about dangerous car drivers, but what about those same cyclists’ cavalier attitude around pedestrians? Welcome to the transportation food chain where bicycles tend to be caught right in the middle. [...]

Cycling ‘Tour of Mississauga’ 2008

Date: Sunday, October 19, 2008 Registration: 8:30am (100 participant max) Start Time: 9:30am Start/Finish Location: J.C. Saddington Park Distance: choice of 47.3km or 26.5km Route Map: Click here to download the new map (as of 10/16/2008) Navigation Instructions: Click here to download detailed long route instructions **** Thanks to all who attended! **** Tour of [...]

Bike Trail Connectivity Presentation

In March 2008, Stephen Largy gave a presentation to the Mississauga Cycling Advisory Committee outlining ideas on ways to expedite connectivity between the existing bike trails in Mississauga. As always when laying out new bike lanes and trails, safety and visible route identification must be taken into consideration. [...]